Line guides: what decides whether a build works
Specification notes for the assembly lines we build: what to fix before drawings, what the run-off checks, and the defects each line has to hold.
Pumps, caps and dip tubes
2 guides
The parts that decide pump feel and cap fit: spring and ball valve, prime and leak check, actuator and overcap seating.
Foam Pump Assembly Line: How to Specify One
How a foam pump assembly line is specified: station sequence, the four points that set scrap rate, and what to send for a quote.
Foam Pump Assembly Machines · line guideSpray Cap Assembly Line: What Decides Quality
Four things fix the layout: the cap type (mist, spray or lotion), the insert and orifice, the volume per shift, and how many cap…
Spray Cap Assembly Machines · line guideRiveting and clamp fitting
1 guides
Joint strength and leak-proof seats: rivet force, tank distortion, clamp orientation.
Small-part assembly
5 guides
Press fit, balance, backlash and latch cycling — the checks that decide whether a small-part cell holds its numbers.
Curtain Pulley Assembly: Cord Path and Drag
The pulley type (single wheel, double wheel or runner), the cord, and the load the pulley carries set the layout. A pulley that is…
Curtain Pulley Assembly Machines · line guideBlower Wheel Assembly: Balance and Shaft Fit
The wheel diameter, the motor shaft, the running speed and the balance grade are the four inputs. A wheel that is quiet at 800 rpm…
Blower Wheel Assembly Machines · line guideToy Gearbox Line: Backlash, Grease and Run-In
The number of gear stages, the plastic, the motor and the acceptable noise level decide the line. A single-stage box can be stacked…
Toys Gearbox Assembly Machines · line guideCar Door Lock Assembly: Latch Cycle Test
The lock type (manual, central locking or with a key cylinder), the actuator, and the latch force the customer accepts decide the…
Car Door Lock Assembly Machines · line guideBearing Press-Fit: Force Control and Damage
The bore and shaft tolerance, the bearing size, and whether the fit is by press or by thermal shrink decide the line. A press line…
Bearing Assembly Machines · line guideSend the drawing for this line. We come back with station layout, cycle time and price.
A quote normally takes three working days once the part information is complete. If something is missing we tell you which drawing is needed instead of guessing a price.
- 012D drawing or STEP file, and the sub-parts
- 02Material and surface finish of each component
- 03Target cycle time, annual volume, shifts per day
- 04The defect you cannot ship — leak, torque, appearance
- 05Bottle neck thread or mating part