BEST MACHINES Equipments Co., Ltd.
Home / Machines / Guides

Curtain Pulley Assembly: Cord Path and Drag

The pulley type (single wheel, double wheel or runner), the cord, and the load the pulley carries set the layout. A pulley that is judged by feel on a…

How a curtain pulley line is specified

The pulley type (single wheel, double wheel or runner), the cord, and the load the pulley carries set the layout. A pulley that is judged by feel on a workbench needs a measurable drag figure on the line, or the judgement moves to the customer.

Station sequence

Housing feeding, wheel placement, axle pin pressing, hook or bracket fitting, then a free-rotation check under load. The pin press is the station that decides whether the pulley turns freely for the next ten years.

What decides feel and life

  • Pin press depth: a pin pressed too far pinches the wheel, too little and the wheel walks out.
  • Wheel free torque: state a maximum turning torque under a stated load.
  • Hook alignment: a bracket 2 degrees off makes the cord rub the housing.
  • Cord path: sharp edges anywhere on the path cut the cord before the pulley fails.

What we need from you

  • Drawing of the housing, wheel and pin, with the fit tolerance
  • Cord type and diameter, and the working load
  • The drag figure you accept and how it is measured
  • Output per shift and the number of variants

How the project runs

Quote from drawing, tooling design, build, then run-off with your own parts in our plant in Chashan. Machines are built to your samples and drawings, and the drawing set is agreed before metal is cut.

Send a drawing to [email protected] or call +86-18123647785 to start a quote. Related lines: car door lock assembly machines, toys gearbox assembly machines.

Quotation

Send the drawing for this line. We come back with station layout, cycle time and price.

A quote normally takes three working days once the part information is complete. If something is missing we tell you which drawing is needed instead of guessing a price.

  • 012D drawing or STEP file, and the sub-parts
  • 02Material and surface finish of each component
  • 03Target cycle time, annual volume, shifts per day
  • 04The defect you cannot ship — leak, torque, appearance
  • 05Bottle neck thread or mating part