BEST MACHINES Equipments Co., Ltd.

Perfume Pump & Cap Assembly: Stem, Spring, Gasket and Spray Check

How a perfume pump and closure cell is specified: component feeding, stem and spring fit, gasket seal, dip tube seat, cap closure and the prime or spray…

How a perfume pump and cap cell is specified

A perfume pump and closure line assembles the actuator, stem, spring, gasket and dip tube inside the pump body, then fits the cap or overcap and checks the spray. The specification starts from the pump components: stem and spring dimensions, gasket bore, dip tube length, and the actuator or cap that clicks or screws onto the body. Feeding, assembly and test stations are set to your part geometry and cycle, so a pump family with several cap sizes shares the cell through fixture changeover.

Station sequence

The pump body locates in a nest, the stem, spring and gasket are fed and seated in order, the dip tube is inserted to depth, then the actuator and closure are fitted. A prime or spray check follows so a pump that does not prime or sprays off-pattern is caught before packing. The finished pump unloads to the cap or bottle filling stage. Component tracks and feeders are sized to small spring and gasket parts that are easy to twist or drop.

What decides reject rate

  • Spring and stem fit. A spring that sits cocked or a stem that seats shallow changes pump travel and weakens the spray.
  • Gasket seal. A twisted or displaced gasket leaves a seal that leaks at the collar or does not hold prime.
  • Dip tube seat. A tube that does not seat reaches air or draws poorly; a kinked tube restricts the draw.
  • Closure fit. A cap that skews or sits loose changes the actuator height and the spray angle, and reads as a finish fault.
  • Component orientation. Small stems and actuators fed in reverse pass the nest visually and fail at the spray check.

What we need from you

  • Pump component drawings or samples: body, stem, spring, gasket, dip tube, actuator and cap
  • The assembly sequence and any torque, click-fit or seating depth the closure requires
  • Target cycle time, annual volume and the pump numbers sharing the cell
  • The spray or prime check method: spray pattern, prime strokes, leak or sound test

How the project runs

Quote from drawing, feeder and nest design, build, then run-off with your own pump components in our plant in Chashan, Dongguan. The station layout, cycle time and acceptance spray check are agreed before tooling is cut. Two-year warranty, with operator training at run-off.

Send a drawing to [email protected] or call +86-18123647785. Related lines: foam pump assembly lines, spray cap assembly machines.

Machines for this part: Perfume Pump & Cap Assembly Machines — the models we build, with station count and cycle time per line.

Quotation

Send the drawing for this line. We come back with station layout, cycle time and price.

A quote normally takes three working days once the part information is complete. If something is missing we tell you which drawing is needed instead of guessing a price.

  • 012D drawing or STEP file, and the sub-parts
  • 02Material and surface finish of each component
  • 03Target cycle time, annual volume, shifts per day
  • 04The defect you cannot ship — leak, torque, appearance
  • 05Bottle neck thread or mating part