Dip Tube Assembly: Feed, Insertion Depth and Seat Check
How an aerosol valve dip tube cell is specified: tube length and material, collar fitting, insertion depth into the valve body, seating check and what the…
How a dip tube assembly cell is specified
The dip tube has to reach the bottom of the aerosol can while sealing into the valve body, so the specification starts from the tube: outside diameter, cut length, material and flexibility, and the valve body it inserts into. The collar or fitting that seats against the valve decides whether the tube clips, screws or pushes in, and the insertion depth sets how far the tube sits below the valve seat. Feeding and insertion stations are configured to your tube and valve rather than a standard bore.
Station sequence
The valve body locates in a fixture, the tube is fed to length and the collar or fitting is fitted to the tube end, then the tube is inserted into the body to the set depth. A seating check confirms the tube is seated and not skewed, the end is free of kink or scratch, and the part unloads for valve packing. A leak or pull check can follow insertion so a loose tube never reaches a finished valve.
What decides reject rate
- Length tolerance. A tube that is too short does not reach the product; one too long bends inside the can or pushes against the bottom.
- Insertion depth. Shallow insertion leaves a seat that leaks; forcing the tube past the depth mark splits the collar.
- Collar fit. A collar that sits off the tube axis tilts the stem and stops the valve sealing.
- Tube condition. A kink, flatten or scratch from feeding restricts the draw or opens a crack at the seat.
- Valve orientation. A reversed body inserts the tube into the wrong port, which passes the visual check and fails in use.
What we need from you
- Tube drawing: outside diameter, cut length, material and the collar or fitting type
- A valve body sample or drawing, with the insertion depth and seat dimensions
- Target cycle time, annual volume and the valve numbers sharing the cell
- Any check you require: seat pull-out, leak test or end-inspection vision
How the project runs
Quote from drawing, feeding and insertion tooling design, build, then run-off with your own valves and tubes in our plant in Chashan, Dongguan. The insertion depth, feed recipe and acceptance test are agreed before tooling is cut. Two-year warranty, with operator training at run-off.
Send a drawing to [email protected] or call +86-18123647785. Related lines: foam pump assembly lines, perfume pump and cap assembly machines.
Machines for this part: Dip Tube Assembly Machines — the models we build, with station count and cycle time per line.
Send the drawing for this line. We come back with station layout, cycle time and price.
A quote normally takes three working days once the part information is complete. If something is missing we tell you which drawing is needed instead of guessing a price.
- 012D drawing or STEP file, and the sub-parts
- 02Material and surface finish of each component
- 03Target cycle time, annual volume, shifts per day
- 04The defect you cannot ship — leak, torque, appearance
- 05Bottle neck thread or mating part