Toys gearbox automatic assembly machine
Custom toys gearbox assembly machine built to your housing and gear set. Station layout and fixtures set to your part and cycle. Send a drawing for a quote.


What this machine is for
This line assembles small plastic gearboxes for toys and small appliances: gear sets pressed onto shafts, housing closing, grease application and a run-in check. Stations are laid out for the short cycle times and frequent model changeovers that toy gearbox families need, so one line can cover several ratios.
The machine features 1.The machine is fully automatic input material mode, only need simply manual operation to refill materials it is run out.
2.The machine automatically counting, output setting; auto operated with material, auto warming when run out of material.
3.Using touch screen, intuitive interface, simple operation, safely.
4.With Automatic detection, timely shutdown, alarm function.
5.automatically stop and send the alert alarm when there is abnormal situation occur, also display abnormal information Product function:
1.Automatic assembly of the base 2.Mold one out of two automatic assembly gears 3.automatic Dispensing 4.Automatic axle assembly(1); 5.Automatic four-claw wheel assembly 6.Automated Inside ratchet assembly 7.Automatic Inertia wheels assembly 8.Automatic axle assembly (2) 9.Automatically cover plate assemble the 10.Automatic detection of superiority and inferior products (superiority and inferior product discharger separately)
What to send for a quote
- 2D drawing or STEP file of the housing, the gear train and the output shaft
- Gear ratio, module and the backlash or torque limit you accept
- Whether grease is applied inside the line or after it
- Target cycle time, annual volume and number of shifts per day
- Supply available at your plant: voltage and frequency, air pressure
Related machines
foam pump assembly machines, blower wheel assembly machines, spray cap assembly machines.
Quotes: [email protected] or +86-18123647785. Machines are built and run off in our 5,000 m2 plant in Chashan, Dongguan.
Line-level guide: toy gearbox line guide - how this line is specified and what a run-off checks.
Send the drawing for this machine. We come back with station layout, cycle time and price.
A quote normally takes three working days once the part information is complete. If something is missing we tell you which drawing is needed instead of guessing a price.
- 012D drawing or STEP file, and the sub-parts
- 02Material and surface finish of each component
- 03Target cycle time, annual volume, shifts per day
- 04The defect you cannot ship — leak, torque, appearance
- 05Bottle neck thread or mating part